| Reference 1 (Commercial Parking Lot and Hallway Coverage) | ||
![]() |
![]()
|
|
|
After the AC light is turned off by the Timer, the eLEDing is still available to illuminate the area |
|
|
![]() |
![]() |
|
| Security / safety enhancement | Enhances the surveillance system as well | |
![]() |
![]() |
![]() |
|
Solar board faces up to the sunlight at 45° |
The system is charging during the day time |
|
|
Reference 2 (Commercial
Building in Lobby and Stairway Coverage)
|
|
![]() |
![]() 2nd Floor Lobby
|
|
Lobby |
|
![]() |
![]() |
|
The Stairway |
The Stairway |
| Reference 3 (Residential) | ||
![]() |
![]() |
![]() |
| Mounted base plate | Mounted the unit | |
![]() |
![]() |
![]() |
| Mounted on the wall | The front entry area | |
![]() |
![]() |
![]() |
| The house front entry | ||
| The garage front corner | The side way | |
![]() |
![]() |
![]() |
| When driving back home during the night | During the night time | |
| Reference 4 (Storage/Trailer or Hangar Setting) | ||
![]() |
![]() |
![]() |
| Mark the wall where the eLEDing is to be mounted | Place the mount plate on the wall with all four screws | Set eLEDing by sliding into the mounting plate |
![]() |
![]() |
![]() |
| Then insert screw in the button bolt | Set up the solar charger to face the sun as long as possible | Complete installation with multi adjusting for ePIR head & LED-Matrix |
![]() |
![]() |
![]() |
![]() |
eLEDing will provide the light! |
|
| Reference 5 (Carrying with You to Travel or Camp) | ||
![]() |
![]() |
![]() |
| Unplug powered wire / release button screw | Push up the eLEDing to remove from the wall | Carry with you while traveling |
![]() |
![]() |
![]() |
| Switch on the unit for portable lighting | Lighting to pre-flight | Provides light for loading or unloading |
![]() |
||
| Cabin lighting | ||